When do I need to order everything for my renovation?
Pick your project and your start date. We'll turn real lead times into an order-by date for every item — so nothing puts your project on hold. Free, no sign-up.
13 of 41 items need to be ordered before work starts — and 2 are already past their order-by date for this start date.
Insulation and Drywall
phase starts Oct 1, 2026
- Insulationorder by Sep 17, 2026
- Drywall / drywall repairsorder by Sep 17, 2026
Waterproofing and Framing
phase starts Oct 5, 2026
- Shower pan / linerorder by Sep 21, 2026
- Cement board (shower walls)order by Sep 21, 2026
- Waterproofing membraneorder by Sep 21, 2026
Tile and Flooring
phase starts Oct 8, 2026
- Shower wall tileorder by Sep 8, 2026
- Shower floor tileorder by Sep 8, 2026
- Bathroom floor tileorder by Sep 8, 2026
- Vanity backsplash tileorder by Sep 8, 2026
- Groutorder by Oct 3, 2026
Vanity, Toilet, and Fixtures
phase starts Oct 15, 2026
- Shower enclosure / glass doororder by Jul 17, 2026 · order now
- Tuborder by Jul 17, 2026 · order now
- Vanityorder by Aug 16, 2026
- Vanity countertoporder by Aug 16, 2026
- Sink(s)order by Oct 1, 2026
- Sink faucet(s)order by Oct 1, 2026
- Medicine cabinet / mirrororder by Oct 1, 2026
- Storage cabinet(s) / shelvesorder by Oct 1, 2026
- Cabinet hardwareorder by Oct 1, 2026
- Showerheadorder by Oct 1, 2026
- Shower handles / valveorder by Oct 1, 2026
- Shower drainorder by Oct 1, 2026
- Bathtub faucetorder by Oct 1, 2026
- Vent fanorder by Oct 1, 2026
- Vanity light fixtureorder by Oct 1, 2026
- Overhead lightorder by Oct 1, 2026
- Toiletorder by Oct 10, 2026
- Shower curtain rodorder by Oct 10, 2026
- Toilet paper holderorder by Oct 10, 2026
- Towel bar(s)order by Oct 10, 2026
- Robe hooksorder by Oct 10, 2026
- Grab barsorder by Oct 10, 2026
Paint and Finishes
phase starts Oct 20, 2026
- Door hardwareorder by Oct 6, 2026
- Window treatmentsorder by Oct 6, 2026
- Outlet covers / switch platesorder by Oct 15, 2026
- Shower curtain / rodorder by Oct 15, 2026
- Wall paintorder by Oct 18, 2026
- Ceiling paintorder by Oct 18, 2026
- Door paintorder by Oct 18, 2026
- Trim paintorder by Oct 18, 2026
- Caulk (tub, shower, vanity)order by Oct 18, 2026
Dates change. Your plan should change with them.
Save this plan as a free Hausbound project: check items off as you order, forward order emails to auto-track deliveries, and every order-by date recomputes when your schedule moves.
Save my plan — freePlanning a basement, laundry room, home office, or another project? Those templates — with the same order-by engine — are included with Hausbound's unlocked plans.
How this works
Your start date sets when each build phase begins, and every item's order-by date is worked backward from the phase that needs it, using conservative lead times — the full method is in the renovation ordering timeline.
What's different here: these are one-time estimates, but inside Hausbound the same engine recomputes your dates automatically when your schedule moves, your retailer quotes a different lead time, or an order email lands in your Hausbound Mailbox.