The Hausbound field guides
Renovation planning, without the schedule surprises
The practical mechanics of getting a remodel done: what to order when, how to measure, what things cost, and how to recover when the schedule slips. No mood boards โ just the math and the lead times.
18 guides ยท written by the team behind Hausbound
The free renovation spreadsheet (and what it can't do)
A free, pre-filled renovation spreadsheet for kitchens, bathrooms, and more โ every item by build phase with lead-time warnings. Plus the honest limits of tracking a renovation in a spreadsheet.
Get the spreadsheet โ
Ordering & lead times
When should you order windows for a renovation?
6โ10 weeks ahead for stock vinyl, 8โ16 for custom or wood-clad, longer for specialty shapes. Lead times by type, why windows gate the whole schedule, and the ordering sequence that works.
6 min read
The renovation ordering timeline: what to buy when
Lead times run the whole project. A category-by-category look at how far ahead you need to order โ and how to work backward from your install dates.
7 min read
What order should you renovate a kitchen in?
The seven-phase sequence builders actually use โ demo through appliances โ why the order isn't negotiable, and why the buying order runs almost opposite to the install order.
7 min read
How long do custom cabinets take?
Custom runs 8โ12+ weeks, semi-custom 4โ8, stock 1โ3. What drives the wait, how revisions reset the clock, and how to plan the whole kitchen around it.
6 min read
Stock vs. semi-custom vs. custom cabinets: which tier do you need?
The real differences in cost, lead time, and sizing between the three cabinet tiers โ and a three-question framework for choosing.
6 min read
When should you order appliances for a kitchen remodel?
Choose first, deliver last: why spec sheets gate the cabinet order, lead times by tier, and the delivery-timing move that protects the schedule.
5 min read
Measurement & math
How to measure a room for flooring, tile, and paint
The actual math: floors, walls, ceilings, trim, countertops, and backsplash โ with the waste factors that keep you from coming up one box short.
6 min read
Paint quantities explained: gallons, coats, and sheens by room
How much paint a room really takes, why the second coat isn't optional, and which sheen belongs on which surface.
5 min read
How much tile do I need for a shower?
The complete shower-tile math, worked on a real example: walls, niche, curb, and pan โ with the 15% waste factor and the dye-lot rule.
6 min read
Budget & money
How much does a bathroom remodel cost?
Most full bathroom remodels land between $12,000 and $35,000. The line-item breakdown by tier โ budget refresh, mid-range gut, high-end โ plus the materials split and the rows everyone forgets.
6 min read
Kitchen remodel budget breakdown: where the money actually goes
How a materials budget really splits across cabinets, counters, appliances, and flooring โ plus the difference between estimated and actual spend.
6 min read
Renovation contingency: how much extra should you budget?
10% for cosmetic work, 15โ20% for gut remodels, more for old houses. What the reserve covers, what it doesn't, and when you can safely release it.
5 min read
Planning & recovery
Do you need a permit to remodel a kitchen or bathroom?
Like-for-like swaps usually don't need one; moving a drain, adding a circuit, or opening a wall almost always does. The trigger list, typical fees, and the inspection holds that quietly cost you weeks.
7 min read
How long does a kitchen remodel take?
6โ10 weeks of active work, 4โ6 months of calendar time. The phase-by-phase breakdown, the countertop templating gap that stalls a nearly-finished kitchen, and the five things that double the schedule.
7 min read
The order-first method: when every date says you're already late
Starting a project after the 'ideal' ordering window has passed isn't failure โ it's normal. How to triage what to order now, soon, and later.
5 min read
How long does a bathroom remodel take?
3โ5 weeks of active work, 6โ9 weeks of calendar time. The week-by-week breakdown, the shower-glass trap, and what turns a 5-week bathroom into 10.
6 min read
What should you renovate first in a house?
The priority ladder: stop damage, fix the envelope and systems, then kitchens and baths, then cosmetics โ plus the live-in-it-first rule.
7 min read
Skip the reading โ get your dates
The order-by calculator turns a start date into a dated ordering plan for a kitchen or bathroom. Free, no sign-up.