Ordering & lead times

Blinds vs. shades for a renovated room: lead times, inside vs. outside mount, when to measure

Blinds are slats that tilt (wood, faux wood, aluminum); shades are a single piece of material that rolls or folds (roller, cellular, roman, woven wood). Stock sizes ship in days. Made-to-measure roller, cellular and faux-wood products run 1 to 3 weeks; real wood, roman, woven and motorized run 3 to 6 weeks; shutters 6 to 10. Measure only after the window trim is installed, caulked and painted, because an inside mount depends on the finished jamb depth and an outside mount depends on the finished casing. Order 3 to 5 weeks before the day you need privacy, and hang them last, after the painter and the floor crew are gone.

October 11, 2026 · 6 min read

Blinds or shades: what each one is, and where it belongs

TypeWhat it isBest forLight and privacyWatch for
Faux-wood blinds2 inch PVC or composite slats on a tilt cord or wandBathrooms, kitchens, laundry, rentalsTilt for light with privacy; raised, they stack 6 to 8 inchesHeavy over 60 inches wide; sag on very wide windows
Wood blindsBasswood slats, stained or painted, 2 or 2.5 inchLiving rooms, offices, bedrooms with a dry climateSame control as faux wood, lighter weight, warmer lookWarp in a steamy bathroom; longest lead time of the blinds
Aluminum mini blinds1 inch metal slatsGarages, utility rooms, budget roomsFine control, little insulationDent, rattle, read as an office
Roller shadesOne flat panel on a tube, light-filtering or blackoutModern rooms, large windows, anywhere a clean look mattersUp or down; no in-between light control unless it is a dual (zebra) shadeLight gap of 1/4 to 1/2 inch each side on an inside mount
Cellular (honeycomb) shadesPleated fabric cells that trap airBedrooms, nurseries, cold or sunny windowsBest insulation of the group; blackout versions exist; top-down/bottom-up optionCells collect dust; cords on older styles
Roman shadesFabric that folds into soft or flat pleats as it risesBedrooms, dining rooms, windows that get curtains elsewhereFabric decides it; lined for privacy, blackout-lined for sleepMade to order almost always; longest shade lead time
Woven wood (bamboo) shadesNatural reeds or grasses that roll or foldLiving rooms, sunrooms, texture over a plain wallFilters light; privacy needs a linerGaps show at night without the liner
ShuttersHinged louvered panels on a frameFront-facing rooms, coastal or traditional housesFull control; permanent-looking6 to 10 weeks; frame changes the opening; priciest option

The split that matters for a renovation is not the look, it is the timing. Blinds and roller or cellular shades in standard sizes exist in a warehouse somewhere and can be in the house inside a week. Roman shades, real wood blinds, shutters and anything motorized are made for your window after you order, and a wrong measurement starts the clock again.

Lead times by product and tier

ProductStock size (off the shelf)Made to measureNote
Faux-wood blindsSame day to 5 days1 to 3 weeksThe workhorse; most online sellers cut to size in a week
Wood blindsRare in stock3 to 5 weeksStain matching to the floor adds a sample round
Aluminum mini blindsSame day1 to 2 weeksCut-down service at the big-box desk for stock widths
Roller shadesSame day for common widths1 to 3 weeksFabric choice drives the wait; blackout and solar fabrics often ship fastest
Cellular shades2 to 7 days1 to 3 weeksTop-down/bottom-up and cordless are made to order even in stock sizes at some sellers
Roman shadesLimited stock widths, 2 to 7 days3 to 6 weeksA custom fabric adds the fabric mill's lead time on top
Woven wood shadesRare in stock3 to 5 weeksLiner is a separate line on the order; add it
Motorized (any shade)Rare in stock3 to 6 weeksBattery or wired; wired needs the electrician before drywall
ShuttersNever6 to 10 weeksMeasured by the installer, not by you

Add a week to any of these if the color or fabric is a sample you have not seen in the room. Window coverings are chosen late, so the sample round is where most of the delay hides. The same sample rule, with the fullness and length math, is in custom vs. ready-made curtains; curtains and shades on the same window are ordered together so the colors are seen side by side.

Inside mount or outside mount

An inside mount sits within the window frame, between the jambs, and shows the trim. An outside mount hangs on the wall or the casing above the window and covers it. The decision is made by the window, not by taste, and it is made after the trim is on.

QuestionInside mountOutside mount
How deep is the frame?Needs a flat, unobstructed depth: about 1 inch for a roller or cellular shade to fit at all, 2 to 3 inches for it to sit flush; wood and faux-wood blinds want 3 to 3.5 inches to sit flushAny depth; the product sits on the wall
Is the opening square?Within 1/4 inch top to bottom, or there will be a light gap on one sideHides an out-of-square opening
What is in the way?Crank handles, tilt latches, alarm sensors and tile returns all collide with an inside mountClears all of them
Light controlLight gaps of 1/4 to 1/2 inch on each side of a shade; blinds leak lessOverlap 1.5 to 3 inches each side and 2 to 4 inches above; the best blackout
LookClean; shows good trim; the standard for faux wood in a bathroomMakes a small window look taller; covers plain drywall returns
MeasureThe opening itself; the seller deducts the clearanceThe area you want covered; you set the overlap

Drywall returns have no trim to measure from. A window finished with drywall wrapped into the opening (no wood casing) gets its final width when the corner bead is mudded and painted, and that width can be 1/4 inch narrower than the rough frame. An inside mount measured before the paint is a blind that does not fit. Wait for the painter.

When to measure, and how

Measure after the casing is installed, caulked and painted, after any tile that returns into the window, and after the sill or stool is on. Before that, every number you take is a rough number. The measuring itself takes ten minutes a window with a steel tape.

StepInside mountOutside mount
WidthMeasure at the top, middle and bottom of the opening; write down the narrowest, to the nearest 1/8 inch; do not deduct anything, the factory doesWidth of the area to cover: the casing outside edge to outside edge, or the opening plus 1.5 to 3 inches each side on a plain wall
HeightMeasure at the left, center and right; write down the longest for a shade, the shortest if the blind must clear the sillFrom where the headrail will sit (2 to 4 inches above the opening) to the sill, or 1 inch below a sill that does not stick out
DepthFlat, unobstructed depth from the glass stop to the front of the frame; this is what decides flush or notNot needed, but check that the wall above the window is flat for 3 inches
ObstructionsNote cranks, latches, sensors and handles; most products list a minimum depth to clear themNote the casing profile; a thick top casing may need spacer blocks
ControlsDecide the cord or wand side now; it is set at the factorySame
LabelOne line per window: room, window, width × height, mount, control side, product and colorSame; two windows side by side are two orders, not one

Order every window in the room on one order, in one color run, the same week. A faux-wood white from one batch and the same white from a batch three months later are two whites in the same room. If one measurement is in doubt, hold the whole order a day and re-measure rather than order the others first.

The order date

StepWhenWhy then
Choose the type and colorWith the paint and the curtains, samples in hand in the roomThree fabrics and a wall color meet at the window; chosen apart they fight
Decide the mount per windowThe day the casing is finishedDepth and squareness are final only then
MeasureAfter the trim is painted and any tile return is groutedThe finished opening is the only one that counts
Order stock faux wood, roller or cellular2 to 3 weeks before move-inA week to ship, a week to find the one that arrived bent
Order wood, roman, woven, motorized5 to 7 weeks before move-in3 to 6 weeks to make it, plus the sample round
Order shutters8 to 12 weeks before move-in; installer measures6 to 10 weeks to make, then an install visit
InstallThe last day, after floors are finished and the painter has leftDust and a second coat of trim paint both ruin a hung shade

If the house is occupied during the work, buy a $10 pack of paper pleated shades the day the old coverings come down. They tape to the frame, last for months, and keep the bedroom private through the whole gap. The rest of the living-through-it plan is in how to plan a renovation while living in the house. Where the windows themselves fall in the schedule, and why their lead time runs the whole job, is in when to order windows.

Where to order, by product

Faux-wood and cut-to-size roller and cellular shades are a commodity: order them from a cut-to-size blinds seller that lists the deduction it takes on an inside mount, and keep the confirmation email, which repeats your measurements back. Motorized roller and cellular shades, especially with a remote or an app, are a separate category; a motorized-shade maker will ask about the window depth and the power source before the fabric. Roman shades in a specific fabric are closer to curtains than to blinds and come from a made-to-measure curtain and roman shade workroom, on the curtain lead time, 3 to 6 weeks.

Three mistakes that cost a reorder

  • Deducting for an inside mount yourself. Sellers take 1/4 to 1/2 inch off the width at the factory. Send the exact opening; a shade measured at 35 inches and ordered at 34.5 arrives at 34 and lets in an inch of light.
  • Measuring one window and multiplying. Four identical windows on a drawing are four different widths after the trim carpenter, by up to 3/8 inch. Measure each one.
  • Ordering before the tile. A tile return in a bathroom or kitchen window takes 1/2 inch or more from each side of the opening. The blind measured on bare drywall does not fit the finished window.

Window coverings are the last thing on the window and the first thing a neighbor sees. Choose them with the paint, measure them after the trim, order the fast ones three weeks out and the slow ones six, and hang them on the last day.