Ordering & lead times

Cabinet hardware: how many pulls and knobs, what size, and when to order

Count one knob or pull for every door, one for every drawer, and two for any drawer 30 inches or wider, then add about 10 percent for spares. An average kitchen lands around 30 to 40 pieces. Size a drawer pull at roughly one third of the drawer's width, and buy by center-to-center spacing, the distance between the two screw holes, because that number is what the drill template uses. Order when the cabinet order is placed if the hardware is made to order, and no later than the week the cabinets arrive if it is stocked. Below: how to count, a size table by drawer width, where each piece sits, what it costs, and the lead times.

November 8, 2026 · 6 min read

How to count

Walk the cabinet layout or the shop drawings and count fronts, not boxes. A 36 inch base cabinet may be two doors, or three drawers, or one drawer over two doors. Each front that opens gets its own hardware, with these exceptions and additions:

  • Drawers 30 inches or wider usually get two pulls, or one long one. A single short pull in the middle of a wide drawer makes it rack as it opens.
  • Tall pantry doors often get a longer pull, 8 inches or more, so check they are not counted with the standard doors.
  • Integrated dishwasher and fridge panels need appliance pulls, which are heavier and mount differently from cabinet pulls. Count them separately.
  • Sink false fronts do not open and get no working hardware. Some people add a matching pull for looks, which is a design choice to make before ordering.
Worked exampleFrontsPieces
Doors1818
Drawers under 30 inches99
Drawers 30 inches or wider36
Subtotal30 fronts33
Spares at about 10 percent4
Order37

The spares are not padding. Boxes arrive one short, a finish chips during install, and a door added next year needs a pull from a product line that may be discontinued by then. Finishes also vary a little from batch to batch, especially living finishes such as unlacquered brass, so buy the whole count at once.

What size: the 1/3 rule

The usual guide is an overall pull length of about one third of the drawer width. Pulls are sold by center-to-center spacing, which is shorter than the overall length, so the table goes from one to the other. Sizes are the common stock spacings, and many of them are metric numbers in inch clothing: 96 mm is 3 3/4 inches, 128 mm is 5 1/16 inches and 160 mm is 6 5/16 inches.

Drawer widthOne thirdCommon center-to-center
12 inches4 inches3 inches or 3 3/4 inches (96 mm)
15 inches5 inches3 3/4 inches (96 mm)
18 inches6 inches5 1/16 inches (128 mm)
24 inches8 inches6 5/16 inches (160 mm) or 7 9/16 inches (192 mm)
30 inches10 inches8 13/16 inches (224 mm) single, or two at 5 1/16 inches
36 inches12 inchesTwo at 5 1/16 inches or 6 5/16 inches

A rule of thumb is not a requirement. One size across every drawer looks tidy and costs less on a small kitchen; scaled sizes look better when drawer widths vary a lot. If this is a hardware swap on existing cabinets, measure the existing holes first. A new pull with a different spacing means filling and refinishing the old holes, and a plate that hides them is rarely the look anyone wanted.

Where each piece goes

FrontUsual position
Base cabinet doorUpper corner on the opening side, about 2 to 3 inches down from the top
Wall cabinet doorLower corner on the opening side, about 2 to 3 inches up from the bottom
Drawer, one pullCentered side to side; centered top to bottom, or on the top rail of a Shaker front
Drawer, two pullsEach pull centered on its half, or set about a quarter of the width in from each end
Knob on a doorCentered on the stile, the vertical frame of the door

Before anyone drills, hold a pull against the two tightest spots: a drawer beside an appliance handle, and a corner where two doors or drawers meet. Hardware that hits its neighbor is found at this step or found with a gouge. Screw length matters too. Standard 1 inch machine screws suit a 3/4 inch door, and a drawer with an applied front is thicker and needs 1 1/2 inch or break-off screws. Many hardware boxes include only the short ones.

The usual surprise is the install, not the hardware. The cabinet quote often stops at hanging the boxes and doors. Ask in writing who drills and mounts the hardware, and whether it is priced per piece, commonly about $3 to $10. Otherwise the job lands on the punch list with nobody assigned to it.

What it costs

TierPer pieceAbout 35 pieces
Basic, big-box stock$3 to $8$105 to $280
Mid-range$8 to $20$280 to $700
Solid brass or boutique$20 to $50 or more$700 to $1,750 or more

Prices move a lot by finish and by length, and a long appliance pull can cost as much as five standard ones. Hardware is a small line that gets forgotten in the first budget, then shows up at the moment the contingency is tightest. It belongs in the kitchen budget breakdown from the start.

When to order, and how long it takes

SourceTypical lead timeOrder by
Big-box or online stockA few days to 1 weekThe week the cabinets arrive, after confirming the full count is on hand
Designer lines, stocked1 to 3 weeksWhen the cabinets ship
Made-to-order or specialty finish6 to 12 weeksThe same week as the cabinet order

Pick the hardware when the cabinet order is placed, even if you do not buy it yet, because the door style and the drawer widths decide what fits. A site that says a finish is available is not promising 37 pieces, which is covered in what in stock actually means. Cabinet timing itself, by type, is in how long custom cabinets take.

When it goes on

Hardware goes on near the end, after the cabinets are set and adjusted and usually after the countertops, so doors are aligned before anyone measures from them. Painted cabinets need the finish fully cured first, or the screws and the template mark it. In the kitchen renovation order it sits in the final trim stage. Until it is on, drawers get opened by their edges, which is how new paint gets chipped, so a long gap here is worth avoiding.

Count fronts, add two pulls for wide drawers, add 10 percent, buy it all from one batch, and settle who is drilling before the last invoice comes in.