The punch list: what belongs on it, when the final payment is due, and what to fix before you pay

The punch list is the written list of everything that is unfinished, damaged or not as agreed when the contractor says the job is substantially complete. You walk the job together, write it down, agree a date, and the final payment (in most residential contracts the last 5 to 10 percent) is due when three things are true: the list is closed, the final inspection has passed, and you hold final lien waivers from the contractor and the major suppliers. Below: what belongs on the list room by room, how to run the walkthrough, what to fix before paying and what is a warranty item, and how much to hold back if one item drags on.

October 25, 2026 · 7 min read

When the final payment is due

Before you make the final paymentWhy it mattersWhat it looks like
The punch list is closedLeverage ends with the last check; small items rarely get scheduled after itEvery line initialed or photographed as done
The final inspection passedAn open permit follows the house to a sale and can stop a refinanceThe signed inspection card or the city portal showing final
Final lien waiversA supplier or sub the contractor did not pay can put a lien on your houseUnconditional final waivers from the contractor and the big suppliers and subs
Warranties and manuals handed overYou need the model and serial numbers to claim anythingA folder or a shared drive: appliances, fixtures, windows, roofing
The change orders reconciledThe last invoice should equal the contract plus signed changes, minus creditsOne page that adds up

Read the payment clause in your contract first; it decides which of these are required. Many residential contracts say “final payment due on completion,” which is exactly why the punch list should be written and signed: it is what “complete” means. Some states also cap how much retainage can be held or set deadlines for releasing it, so a local rule can override the contract. How the contingency fits around those last dollars is in renovation contingency.

Hold back in proportion, not everything. If one item is waiting on a part, pay the rest and hold one and a half to two times what it would cost someone else to fix that item, in writing, with a date. Holding the whole final payment over a missing cabinet pull is how a cooperative contractor becomes a collections letter.

What belongs on the list, room by room

AreaCheckCommon misses
PaintWalls and ceilings in daylight and at night with the lights on, at a low angleRoller marks, missed cut lines, caulk gaps at trim, paint on hinges and outlets
Doors and drawersOpen and close every one; check reveals and soft-closeRubbing doors, drawers out of square, a missing bumper, a pull short
Tile and groutRun a hand across edges; look across the floor with a flashlightLippage, grout haze, missing grout in corners, caulk missing at the tub
PlumbingRun every tap hot and cold, fill and drain every sink and tub, flush every toiletA slow drain, a drip under the sink, a toilet that rocks, no hot water to one fixture
ElectricalEvery switch, outlet, light and fan; trip and reset every GFCIA switch that does nothing, a fan that does not vent outside, missing cover plates
AppliancesRun each one through a cycle; check the doors close squareRange not on its anti-tip bracket, dishwasher not secured, ice maker not connected
Flooring and trimWalk every room; look at transitions and shoe moldingGaps at transitions, nail holes not filled, a squeak, a scratch from the move-in
Outside and siteWalk the perimeterDebris, a dumpster scar on the lawn, a gutter knocked loose, a missing screen

Appliances get their own list on the day they arrive; the delivery-day checks are in the appliance delivery day checklist. Locks belong on the punch list too: every key works, and if a smart lock went in, the installer’s codes are deleted and the app is in your name (the install side is in smart locks before the trim goes on).

How to run the walkthrough

  • Walk it once alone first. A day before the joint walkthrough, go room by room with blue painter’s tape and a phone. Tape the spot, photograph it, write one line.
  • Walk it together, in one order. Top to bottom, left to right, every room. Read your list aloud; the contractor adds a date and who fixes it to each line.
  • One list, one version. A shared document or a single email, numbered. Text messages with photos are how items get lost.
  • Agree a finish date. One to two weeks is typical for a remodel punch list; items waiting on a part get their own date.
  • Walk it again to close. Check each fix in person before you initial it. New damage from the fixes goes on the same list.

Punch list or warranty item?

It is a punch list item ifIt is a warranty item if
It is visible or testable at the walkthroughIt shows up after you live there: a crack as the house settles, a seal that fails in winter
It is unfinished or not as specifiedIt was finished and worked, then stopped
It is due before the final paymentIt is covered by the contractor’s workmanship warranty (often one year) or the maker’s

Write the warranty terms down before the last check: how long, who to call, and what counts. A one-year walkthrough on the calendar catches settling cracks, nail pops and caulk that shrank, while the warranty still runs.

What to collect before the crew leaves

  • The paint list. Brand, color name, code and sheen for every room, plus the leftover cans, labeled.
  • Attic stock. A box of the floor tile and a few planks of the flooring, from the same lot. A matching lot is impossible to buy in five years.
  • Photos of the open walls. If you did not take them before the drywall, ask the crew for theirs.
  • Every manual and serial number. Register the appliances while the boxes are still in the garage.

The punch list is the last 5 percent of the work and the last 5 percent of the money; it is also the step that most often stretches a remodel past its date, which is part of why how long a kitchen remodel takes always runs longer than the work. In a bathroom, the last fixtures in, like the toilet, are the first things to test. Write it down, walk it twice, get the waivers, then pay.