Measurement & math

How much tile do I need for a shower?

A standard three-wall shower is one of the most common tile orders — and one of the most commonly under-bought. Here's the complete math, worked on a real example, with every surface people forget.

July 13, 2026 · 6 min read

The surfaces in a shower order

  • The three walls — each is width × height, tiled to your chosen line (ceiling, or a set height like 7′).
  • The niche — the recessed shelf. Small in area, big in cuts: its back panel, four returns, and trim all come out of your tile.
  • The curb — top and both faces, usually in the wall tile or a matching bullnose.
  • The pan (floor) — normally a different tile: small-format mosaic (2″ or smaller) so the surface can follow the slope to the drain and grout lines add slip resistance. Order it as its own line item.

Worked example: a 36″ × 60″ alcove shower, tiled to 8 feet

Back wall: 5′ wide × 8′ tall = 40 sq ft. Two side walls: 3′ × 8′ = 24 sq ft each.

SurfaceMathArea
Back wall5′ × 8′40.0 sq ft
Side wall × 23′ × 8′ × 248.0 sq ft
Niche (12″ × 24″ + returns)≈ 2 + 24.0 sq ft
Curb (top + 2 faces)5′ × (4″ + 4″ + 4″)5.0 sq ft
Wall tile subtotal97.0 sq ft
+ 15% waste97 × 1.15≈ 112 sq ft
Pan mosaic (3′ × 5′) + 15%15 × 1.15≈ 17.5 sq ft

So this "roughly 90 square foot" shower is a 112 sq ft wall-tile order plus ~18 sq ft of mosaic. If tile sells by the box — it almost always does — round up to whole boxes and note the per-box coverage on the order.

Why 15% here, when floors get 10%?

Showers are all edges: every wall meets two others, the niche adds eight cut lines, and plumbing penetrations (valve, head, spout) each cost a tile or two. Large-format tile (12″ × 24″ and up) wastes even more per cut because each offcut is a bigger fraction of a tile. Use 15% as the shower default; go higher for herringbone or diagonal layouts, and for any pattern with a repeat you must match.

Buy all of it at once — including the overage. Tile colors vary between production runs (dye lots). A 10 sq ft top-up ordered three weeks later can arrive visibly a different shade, on the most water-stared-at wall in the house. Leftover boxes are also your repair stock for the next decade.

Don't forget the layer underneath

The tile order is also a backer and waterproofing order: cement board or foam board for the walls (buy it off the same wall-area number, pre-waste), waterproofing membrane or topical sealer per your system, thinset, grout, and the trim profiles or bullnose that finish exposed edges. None of it is glamorous; all of it has to be on site before the setter starts, and special-order trim can have a longer lead time than the tile itself — check it against the ordering timeline.

Measure it properly first

All of this math is only as good as the tape measurements underneath it — measure the actual framed opening, not the listing's "36×60," and keep the numbers somewhere permanent. Our room-measurement guide covers the technique for every surface, and the same numbers price the backer board and waterproofing in one pass.